LightReader

Chapter 158 - Chapter 158: Lin Yi's Craftsmanship (Third Update)

Fortunately, the current weather is not the rainy season.

This also avoids a lot of unnecessary trouble.

Of course, while working in the open air, the factory buildings over there are also under construction.

These factory buildings are mainly constructed by the staff from the Ministry of Industry, leading the refugees.

And their speed is quite impressive.

On average, two small houses are completed each day.

Given this pace, the ten workshops in this area should be completed in less than two months.

As to why ten workshops need to be built in one go?

Because Lin Yi knows that in addition to this mirror, there are many other items that need to be made in the future.

Building them in advance will save a lot of trouble later.

Besides, this unified construction is also planned successfully.

It will be much easier, both aesthetically and in terms of management.

This is the end of Part One, download Chereads app to continue:
More Chapters